Nominal quantity and limits
Translate the declared quantity and applicable rules into documented operating, warning and reject limits.
A checkweigher can support quantity control, evidence and corrective action, but the machine does not replace the packer’s legal and quality responsibilities.
No single machine creates compliance. UK guidance requires suitable quantity-control procedures, suitable checking equipment, records where applicable and action when results show a problem. A checkweigher can inspect every pack and produce evidence, but the packer must define and operate the control system.
Requirements vary with the product, pack, declared quantity and operating method. Treat this page as engineering guidance and confirm legal obligations with Trading Standards or a qualified adviser.
Translate the declared quantity and applicable rules into documented operating, warning and reject limits.
Confirm range, resolution and demonstrated dynamic performance are suitable for the product and decision.
Use defined checks and challenge procedures to show weighing, tracking, rejection and alarms work.
Capture results, changes, corrective action, batch identity and responsible users at the required level.
Define action after a failed check, repeated underweight result, reject fault or lost product tracking.
Use trends and giveaway data to centre filling without weakening the consumer-protection decision.
Official UK guidance describes the average system and the three packers' rules. Your quality or legal team should define the operational method; the checkweigher can then support the chosen limits, checking method, records and escalation process.
Share products, limits, production rate, reject requirements and the record format your team has defined.
Discuss your applicationThe correct method depends on applicable requirements and the packer’s documented system. Obtain advice for your specific process.
Yes, subject to scope. Counts, statistics, rejects, alarms, recipes and batch identifiers can be retained or exported.
No. Feedback centres the process; acceptance and rejection logic protects the defined pack decision. They should remain clearly bounded.
Practical answers for engineering, production and quality teams preparing a UK checkweighing project.
Understand quotation scope, cost drivers and total installed project value.
Plan a budget →02Compare dynamic performance claims using the real pack at line speed.
Define performance →03Build a requirement covering handling, rejects, data and acceptance.
Choose a system →04Look up the official GB band and calculate T1 and T2 planning thresholds.
Calculate TNE →Share pack details, target weights, line speed and any inspection or data requirements.